The design work on the new carrier commenced as early as 1937 and the initial design was unveiled on 27 November and received the number "02". On 21 July 1938 corrections were done to the design and it was approved. The ship of displacement of 27.800 tons was ordered. It was included into Navy development program, approved on 8 December 1938. After the acceptance of the main specifications of the carrier work on the detailed design could be commenced...